top of page
Project Highlights
American Fork Culvert | American Fork, UT
Installation of a 40-foot precast culvert which includes stream alteration, bank stabilization, and other stream bank improvements. The precast culvert work involves cast-in-place culvert footings, culvert installation, and precast wingwall installation. Additionally, we will install nearly 300 feet of residential roadway and a walking path, complete with a storm drain detention system. Other elements of the project include masonry work, electrical work, and landscape restoration improvements.
Eagle Mountain Subdivision | Eagle Mountain, UT
New subdivision.
Leeds Waterline Replacement | St. George, UT
This project involves replacing a 5-mile waterline in Leeds, Utah, which will connect to the main waterline supply and serve Southern Utah residents.
Legacy Soccer Fields | St. George, UT
The large-scale soccer complex project included the creation of five standard-sized soccer fields, parking lots, and roadways. The scope also involved mass grading of the entire complex, drainage, finish grading, site concrete work, and asphalt paving.
Old Highway 91 | Ivins, UT
Widening existing facility.
Santaquin Main Street Improvement | Santaquin, UT
Roadway improvements for the city of Santaquin.
Vialetto PI Pond | Lehi, UT
The project involves constructing a water-tight reinforced concrete/LLDPE liner reservoir with a 5.7 acre-foot capacity for irrigation water storage. The scope includes installing piping, valves, appurtenances, vaults, conduits, screens, and site work such as grading, fencing, gates, drainage swale, drainage structures and piping, clearing, and access roads.
Vineyard Block 5 | Vineyard, UT
Mass excavation and foundation work have been completed for this large apartment complex in Vineyard City, UT.
Address
Main Office
195 East 620 South
American Fork, Ut 84003
Southern Utah Office
316 East 1400 South A2
St. George, UT 84790
Phone
Tel: 801-554-3255
Fax: 801-660-1419
bottom of page